Dense systems, tight schedules: Three data center MEP projects from scan to spool

Data center aisle with white server racks on one side and dark electrical cabinets on the other, under rows of ceiling lights

Data centers are mission-critical facilities with dense mechanical, electrical, and plumbing (MEP) systems and tight schedules. Trades need reliable models and drawings before installation, and design teams need accurate records of what already exists. 

On three data center projects, MEP BIM services delivered that information: fabrication-ready plumbing drawings, a coordinated electrical model, and an existing conditions model built from 3D laser scanning. 

Hexagon Multivista, part of Hexagon, supported these projects through its Create services, helping teams turn models and captured data into deliverables for fabrication, installation, coordination, design, and construction. 

What did the three data center projects deliver? 

Together, the projects covered plumbing fabrication drawings, electrical modeling and coordination, and existing-conditions modeling for design and construction. 

Project  Problem  Approach  Result 
Data center campus, Arizona (two buildings)  Plumbing outputs needed for fabrication, shop production, and installation  Fabrication model quality control, mechanical and plumbing coordination, level of development (LOD) 400 modeling, and shop, spool, and penetration drawings  All plumbing fabrication and installation information for a 101,470 sq ft building within a month 
Data center, US Midwest  An electrical BIM model coordinated with other disciplines  Model development and management, clash detection, coordination, and documentation  A coordinated model that supported advance planning for connections, materials, excavation, and field tasks 
Data center project, United States  Existing conditions documented across 1.8 million sq ft  3D laser scanning and a BIM model built from the scan data  An LOD 300 BIM model for design and construction 

Why is MEP coordination harder in data centers? 

Data centers pack far more infrastructure into facilities where continuous service is critical. Electrical infrastructure alone can be significantly more complicated than in a standard building, with large volumes of cable tray, busway, and associated routing. Equipment connections, stub-ups, and duct banks with multiple voltage levels all must be coordinated precisely. 

Because service continuity is critical, the tolerance for electrical coordination errors is low. This means accurate coordinated models and fabrication-level drawings are critical before work reaches the field. 

How did the team deliver a full building’s plumbing information in a month? 

The team quality checked the work-in-progress fabrication models it received, coordinated mechanical and plumbing elements, and extracted shop drawings and spool drawings for field use. Within a month, the client had all the information needed to fabricate and install plumbing for the complete building. 

The building, a 101,470 sq ft data center on a campus in Arizona, required outputs for fabrication, shop production, and installation. Shop drawings are detailed documents used to fabricate or install specific systems. Spool drawings break piping into prefabricated sections, called spools, with the dimensions and fittings a shop needs to build them, and a crew needs to install them. 

On a second data center building at the same campus, the scope covered LOD 400 modeling and coordination, the level of development typically used for fabrication, plus shop drawings and penetration drawings for plumbing. Penetration drawings show where piping passes through walls and slabs, so openings can be coordinated before installation. Hexagon Multivista Create services delivered all the information the client needed to fabricate and install the plumbing. 

What did the electrical BIM model cover? 

The electrical BIM model covered power distribution systems, lighting systems, grounding and bonding, and data center components. For a data center in the US Midwest, the team developed and managed the model, with clash detection and coordination with other disciplines and documentation as part of the scope. 

Clash detection identifies physical conflicts or clearance problems between modeled elements before installation. The coordinated model supported advance planning: coordinating underground connections and equipment points of connection, comparing layouts by trade to optimize the bill of materials, planning soil movement and excavation, and planning field tasks and their durations. 

How did 1.8 million sq ft of existing conditions become a BIM model? 

On a data center project in the United States, the team captured 1.8 million sq ft of existing conditions with 3D laser scanning, one of the Hexagon Multivista Capture services, and used the resulting point cloud to create an LOD 300 BIM model for design and construction. 

A point cloud is a dense set of 3D points that records captured surfaces and spatial conditions. It is captured data, not a finished model, so the BIM model is the deliverable that design and construction teams use. 

How do MEP BIM services support data center projects? 

MEP BIM services give data center teams information they can act on before and during construction: drawings for the shop and the field, a coordinated model for planning, and a model of existing conditions for design. 

Hexagon Multivista Analyze services extend that work with building progress reporting and deviation analysis. Where clash detection compares modeled elements with each other, deviation analysis compares captured field conditions with the model. 

Ready to discuss MEP coordination or fabrication drawings for your next data center project? Book a complimentary 30-minute consultation with our team. 

See what this could look like for you

We can walk you through a tailored plan based on your workflow, stakeholders, and project phase.

Related Cases

Let’s enhance your project today

Reach out for a complimentary consultation to get Hexagon Multivista data-driven solutions working for you.