Home > Resources > Case Studies > Article
In order to streamline the asset digitalization process as part of the transition to BIM methodology, this Shopping Mall aims to expedite the digitalization of its assets. The goal is to ensure the accuracy of information for its shopping malls and utilize BIM for asset management.
Seven shopping malls were awarded, including Callao in Madrid (40,221 m²) and Pintor Sorolla in Valencia (75,940 m²).
Work was carried out in 7 stores with varying areas (from 27,000 m² to 81,000 m²), including:
We can walk you through a tailored plan based on your workflow, stakeholders, and project phase.