Building Progress Reporting

Building Progress Reporting

Automated model-to-photo comparisons that generate accurate schedule-based progress metrics.

Automated construction progress reporting with insights

Building progress reporting automates construction tracking by floor or trade using reality capture data, proprietary technology, and expert staff.

This offers detailed 360° photo progress, model element “built” status updates, side-by-side views, and progress reports.

With automated progress reporting, general contractors and owners can make better-informed decisions and track schedule performance.

Benefits of progress reporting

Gain clear, objective insights into team performance with Schedule vs. Progress views by trade or floor.
Reduce manual tracking with automated progress-to-date reports generated directly from reality capture data.
Accelerate review cycles while reducing errors, rework, and schedule risk with standardized, expert-verified analysis.

About building progress reporting

Long-term data hosting

Keep up to 10 years of project data accessible in one secure location for audits, claims, or future renovations.

Integration ecosystem

Compatible with Autodesk ACC, Procore, Primavera P6, and Microsoft Project to streamline progress oversight.

Agnostic data inputs

Use 360° photos, LiDAR scans, or third-party tools. Whether self-captured or Multivista-captured, all data works.

One-vendor workflow

Leverage Hexagon’s full suite of capture, analysis, and reporting services for a seamless end-to-end experience.

Advanced BIM-driven Progress tracking

Automatically identify built vs. unbuilt elements and generate 3D and trade-level progress charts for transparent reporting.

No new hardware required

Compatible with the devices and workflows you already use. Access all insights through a secure cloud platform.

How it works

Upload model and schedule

You provide a federated 3D model (NWD) and a project schedule (P6 or Excel).

On-site reality capture

360° photos are captured by Multivista or your team following standardized workflows.

Upload to the cloud

All imagery is uploaded into the cloud platform for automated analysis.

Photo-based progress analysis

Hexagon technology detects progress automatically; expert analysts QA every update.

Progress reports published

Reports appear in your cloud portal, showing progress by trade, floor, or system.

Team notifications

Users receive email alerts when a new progress report is ready for review.

Industries

Improved quality and accuracy across all build types

Testimonials

Discover success stories from our clients

FAQs

Clients must provide 3D models in a NWD format and a project schedule (P6 or Excel format).
Progress reports are available typically 48 – 72 hours after 360 images are posted to the hosting platform
Progress Reporting for new construction requires 3D models (NWD), a schedule (P6 or Excel), and 360° photos from approved apps like Multivista or Hexagon GoCapture. Drone and SLR photos aren’t supported. Setup takes up to eight weeks, and reports are usually ready within 48 hours after uploading images.
Yes, the set up can vary based on the complexity of the project and can take up to 6-8 weeks, so contacting us sooner vs later helps ensure your project gets started on the right foot.

Talk to an expert

Connect with our team to see how automated progress reporting can improve schedule control, reduce rework, and give your project the clarity it needs at every stage.

Talk to an expert

Connect with our team to see how automated progress reporting can improve schedule control, reduce rework, and give your project the clarity it needs at every stage.